Strany 1 - 15/2,24/2 & 30

© Baxi Heating UK Ltd 2009Installation & Service InstructionsThese instructions include the Benchmark Commissioning Checklistand should be left wi

Strany 2 - Natural Gas

Appliance Category CAT I 2H4.0 Technical Data10© Baxi Heating UK Ltd 2009HorizontalFlue Terminal Diameter 110mmDimensions Projection 150mmOutercase D

Strany 3 - © Baxi Heating UK Ltd 2009

5.0 Dimensions and Fixings11© Baxi Heating UK Ltd 2009DIMENSIONSA 600mmB 320mmC 390mmD 125mm Ø Min.E 150mmF 125mmSIDE FLUE (left and right)For every 1

Strany 4 - Legislation

6.0 System Details12© Baxi Heating UK Ltd 20096.1 Water Circulating Systems1. The appliance is suitable for use with open vent fullypumped systems and

Strany 5 - Safe Manual Handling

6.0 System Details13© Baxi Heating UK Ltd 20096.3 Pipework1. The sizes of flow and return pipes from the boiler shouldbe determined by normal methods,

Strany 6 - Contents

6.0 System Details14© Baxi Heating UK Ltd 20096.5 System ControlsThis boiler does not require a bypass.This boiler does not require a permanent live.T

Strany 7 - 1.0 Introduction

6.0 System Details15© Baxi Heating UK Ltd 20096.7 Sealed Systems (Fig. 13)1. SAFETY VALVE - A safety valve complying with therequirements of BS 6750 P

Strany 8 - 2.0 General Layout

7.0 Site Requirements16© Baxi Heating UK Ltd 20097.1 LocationNOTE: Due to the high efficiency of the boiler aplume of water vapour will be discharged

Strany 9 - 3.0 Appliance Operation

7.0 Site Requirements17© Baxi Heating UK Ltd 20097.3 Clearances (Figs. 15 &16)1. A flat vertical area is required for the installation of theboile

Strany 10 - Hydraulic Resistance Chart

7.0 Site Requirements18© Baxi Heating UK Ltd 20097.6 Condensate DrainFAILURE TO INSTALL THE CONDENSATEDISCHARGE PIPEWORK CORRECTLY WILL AFFECTTHE RELI

Strany 11 - 5.0 Dimensions and Fixings

7.0 Site Requirements19© Baxi Heating UK Ltd 2009NIIGFMIAAFHJ,KDEHLikely flue positions requiring a flue terminal guard CRAIJ,KILSBTU7.7 FlueNOTE: Due

Strany 12 - 6.0 System Details

2© Baxi Heating UK Ltd 2009Natural GasPotterton Promax 15/2 HE PlusG.C.No41 605 52Potterton Promax 24/2 HE PlusG.C.No41 601 17Potterton Promax 30 HE P

Strany 13

8.0 Flue Options20© Baxi Heating UK Ltd 20098.1 Horizontal Flue SystemsConcentricThe maximum equivalent lengths are 4m (horizontal) or(vertical). Thei

Strany 14

8.0 Flue Options21© Baxi Heating UK Ltd 2009Y8.2 Twin & Vertical Flue SystemsConcentricThe maximum equivalent lengths are 4m (vertical). Theirleng

Strany 15

8.0 Flue Options22© Baxi Heating UK Ltd 2009Key Accessory Size Code NoFLUE GROUP BConcentric Flue System 110mm diameterA1 Horizontal Flue Terminal 850

Strany 16 - 7.0 Site Requirements

8.0 Flue Options23© Baxi Heating UK Ltd 2009Vertical FlueAdaptorGasket8.4 For Vertical Flue Systems1. Undo the screws securing the blanking plate to t

Strany 17

8.0 Flue Options24© Baxi Heating UK Ltd 20098.6 For Roof Terminals1. In the case of a pitched roof 25 - 50 degrees, positionthe lead tile to replace/f

Strany 18

9.0 Plume Displacement25© Baxi Heating UK Ltd 20099.1 Plume Displacement Kit (P.D.K.)Kit No 5121371Content of kit1 70/110 Concentric Flue1 1m 70 Dia E

Strany 19 - Property Boundary Line

9.0 Plume Displacement26© Baxi Heating UK Ltd 200910246810121470Ø Exhaust (metres)Concentric 70/110 Flue (metres)0161823420 15/2 & 24/230 22242628

Strany 20 - 8.0 Flue Options

9.0 Plume Displacement27© Baxi Heating UK Ltd 20099.3 General Fitting Notes - P.D.K.1. Cut a hole in the external wall which the horizontalconcentric

Strany 21

9.0 Plume Displacement28© Baxi Heating UK Ltd 2009500mm Min.Plume OutletElbow200mm Min.9.3 General Fitting Notes - P.D.K. (cont.)16. For aesthetic pur

Strany 22

10.0 Installation29© Baxi Heating UK Ltd 2009Check Site Requirements (section 7) beforecommencing.10.1 Initial PreparationThe gas supply, gas type and

Strany 23

Installer Notification Guidelines3© Baxi Heating UK Ltd 2009Choose BuildingRegulations NotificationRouteContact your relevant LocalAuthority Building

Strany 24

10.0 Installation30© Baxi Heating UK Ltd 200910.2 Preparing The Boiler1. Remove the outer carton and packaging.2. Lift the outercase upwards and remov

Strany 25 - 9.0 Plume Displacement

10.0 Installation31© Baxi Heating UK Ltd 200910.3 Fitting The Boiler (Fig. 24)1. Remove the screw and retaining bracket from the wallplate spring clip

Strany 26

10.0 Installation32© Baxi Heating UK Ltd 200910.6 Making the Gas Connection1. Connect the gas supply to the G1/2(1/2in BSPTInternal) gas tap. This is

Strany 27

10.0 Installation33© Baxi Heating UK Ltd 200910.7 Fitting the Flue (Cont)6. Ensure the inner flue support bracket is positioned inthe flue (Fig. 28).7

Strany 28 - 500mm Min

10.0 Installation34© Baxi Heating UK Ltd 200910.8 Making The Electrical ConnectionsWARNING: This appliance must be earthed1. The electrical connection

Strany 29 - 10.0 Installation

11.0 Electrical35© Baxi Heating UK Ltd 200911.1 Schematic Wiring DiagramKey To Wiring Colours b - Bluebk - Blackw - Whitebr - Browngy - Greyr - Redg -

Strany 30

11.0 Electrical36© Baxi Heating UK Ltd 2009Wiring Keyb - Bluebk - Blackbr - Brownr - Redw - Whiteg/y - Green/Yellowg - Greengy - Greyop - Opaquey - Ye

Strany 31

12.0 Commissioning the Boiler37© Baxi Heating UK Ltd 200912.1 Commissioning the Boiler1. Reference should be made to BS 5449 Section 5 whencommissioni

Strany 32

13.0 Fitting the Outer Case38© Baxi Heating UK Ltd 200913.1 Fitting The Outer Case1. Position the outercase over the boiler engaging thelugs in the si

Strany 33

14.0 Servicing the Boiler39© Baxi Heating UK Ltd 200914.1 Annual ServicingIf a combustion analyser is available the CO/CO2 can bechecked (for levels s

Strany 34

Legislation4© Baxi Heating UK Ltd 2009This company declares that no substances harmfulto health are contained in the appliance or usedduring appliance

Strany 35 - 11.0 Electrical

14.0 Servicing the Boiler40© Baxi Heating UK Ltd 200914.1 Annual Servicing (Cont)10. To clean the heat exchanger and burner proceed asfollows:a) Disco

Strany 36

15.0 Changing Components41© Baxi Heating UK Ltd 200915.1 Changing ComponentsIMPORTANT: When changing components ensurethat both the gas and electrical

Strany 37 - 12.0 Commissioning the Boiler

15.0 Changing Components42© Baxi Heating UK Ltd 200915.3 Flowswitch (Fig. 47)1. Drain the boiler (see Section 15.1 paragraph 2 & 3).2. Remove the

Strany 38 - 13.0 Fitting the Outer Case

15.0 Changing Components43© Baxi Heating UK Ltd 200915.4 PCB (Figs. 48 & 49)WARNING: The PCB Control and FanAssembly are 325 Vdc. Isolate at suppl

Strany 39 - 14.0 Servicing the Boiler

15.0 Changing Components44© Baxi Heating UK Ltd 2009The fan and venturi, gas valve, injector pipe,condensate trap, fan protection sensor, spark andsen

Strany 40

15.0 Changing Components45© Baxi Heating UK Ltd 2009The removal of the fan is necessary to enable thechanging of the injector pipe, condensate trap an

Strany 41 - 15.0 Changing Components

15.0 Changing Components46© Baxi Heating UK Ltd 2009The burner and heat exchanger can be changed afterremoval of the combustion box door. To change th

Strany 42

15.0 Changing Components47© Baxi Heating UK Ltd 2009Combustion Box BaseCentral Insulation PanelSupport BracketBurner15.12 Heat Exchanger Lower Insulat

Strany 43

16.0 Short Parts List48© Baxi Heating UK Ltd 2009Short Parts ListKey G.C. Description ManufacturersNo. No. Part No.A E06 058 Flow TemperatureThermisto

Strany 44

17.0 Fault Finding49© Baxi Heating UK Ltd 2009LowHighResetONMains OnLED Light(Green)Boiler OnLED Light(Green)LockoutLED Light(Red)LightsOff Off Off

Strany 45

Safe Manual Handling5© Baxi Heating UK Ltd 2009GeneralThe following advice should be adhered to, from when first handling the boiler to the final stag

Strany 46

17.0 Fault Finding50© Baxi Heating UK Ltd 2009No Switched Live toboiler. Check SystemsControls and SystemWiring.240V at B ?Check wiring fromterminal b

Strany 47

17.0 Fault Finding51© Baxi Heating UK Ltd 2009DRY-FIRENOFill system with water andbleed out all air.Replace PCB.YESNOYESNOIs the system full of water

Strany 48 - 16.0 Short Parts List

17.0 Fault Finding52© Baxi Heating UK Ltd 2009IGNITION LOCKOUTYESIs there gas at gas valve inlet?Check isolation valve andgas supply.YESNOReset Lockou

Strany 49 - 17.0 Fault Finding

17.0 Fault Finding53© Baxi Heating UK Ltd 2009OVERHEAT LOCKOUTReplace Stat.Replace Stat.Wiring from PCB tothermostats faulty.YESNOYESNONODisconnectbla

Strany 50

17.0 Fault Finding54© Baxi Heating UK Ltd 2009FAN LOCKOUTRectify wiring.NOYESUnplug3-way PCB connector& unplug fan. Is therecontinuity from N to O

Strany 51

17.0 Fault Finding55© Baxi Heating UK Ltd 2009THERMISTORReplace thermistor.Wiring from PCB tothermistor faulty.YESNONOYESReplace PCB.Unplugthermistor,

Strany 52

18.0 Notes56© Baxi Heating UK Ltd 2009

Strany 53

18.0 Notes57© Baxi Heating UK Ltd 2009

Strany 54

GAS BOILER SYSTEM COMMISSIONING CHECKLISTCONTROLS Tick the appropriate boxesTime and Temperature Control to Heating Room Thermostat and Programma

Strany 55

SERVICE RECORDIt is recommended that your heating system is serviced regularly and that the appropriate Service Record is completed.Service ProviderBe

Strany 56 - 18.0 Notes

© Baxi Heating UK Ltd 20091.0 Introduction 72.0 General Layout 83.0 Appliance Operation 94.0 Technical Data 105.0 Dimensions and Fixings 116.0 System

Strany 57

© Baxi Heating UK Ltd 2009Comp No5113640 - Iss 6 - 8/09POTTERTONA Trading Division of Baxi Heating UK Ltd (3879156)A Division of Baxi GroupBrooks Hous

Strany 58

1.1 Description1. The Potterton Promax HE Plus are gas fired roomsealed fan assisted condensing central heating boilers.2. The maximum output of the P

Strany 59 - SERVICE RECORD

2.0 General Layout8© Baxi Heating UK Ltd 20092.1 Layout (Figs. 3,4,5 & 6)1. Wall Plate2. Flue Elbow3. Heat Exchanger4. Burner5. Air Box6. Fan Prot

Strany 60 - 5113640 - Iss 6 - 8/09

3.0 Appliance Operation9© Baxi Heating UK Ltd 20093.11. Switched Live On: When the switched live switcheson if the flow temperature is less than the s