Performa System12e, 18e, 24e & 28eGas Fired Wall Mounted System BoilersInstallation andServicing InstructionsPlease leave these instructions with
4.0 Technical Data104.4 System 28eFlue Terminal Diameter 100mmDimensions Projection 95mmOutercase DimensionsCasing Height - 780mmOverall Height Inc Fl
5.0 Dimensions and Fixings11DimensionsA 780mmB 345mmC 450mmD 107mm Ø Min.E 200mmF 190mmG 143mm360° Orientation Tube Ø 100mmDCBAEGFHeatingReturn(22mm)H
6.0 System Details126.1 Central Heating Circuit1. The appliance is suitable for fully pumped SEALEDSYSTEMS ONLY. Treatment of Water Circulating System
6.0 System Details136.4 System Filling and Pressurising1. A filling point connection on the central heatingreturn pipework must be provided to facilit
7.0 Site Requirements147.1 Information1. The installation must be carried out by a CORGIRegistered Installer or other registered competentperson and b
7.0 Site Requirements157.5 Ventilation of Compartments1. Where the appliance is installed in a cupboardor compartment, no air vents are required.2. BS
7.0 Site Requirements167.8 Flue1. The flue terminal position must be inaccordance with the current editions of B.S.5440 Part 1, and either Part J of t
7.0 Site Requirements177.9 Flue DimensionsThe standard horizontal flue kit allows for fluelengths between 100mm and 1m from elbow toterminal (Fig. 10)
187.0 Site Requirements7.12 Flue Options1. The Potterton Performa System can be fittedwith flue systems as illustrated. 2. The standard flue is suitab
8.0 Installation198.1 Initial PreparationThe gas supply, gas type and pressure mustbe checked for suitability before connection(see Section 7.6).1. Af
2Natural GasPotterton Performa System 12eG.C.No41 590 88Potterton Performa System 18eG.C.No41 590 89Potterton Performa System 24eG.C.No41 590 90Potter
8.0 Installation208.4 Fitting The Boiler1. Remove the sealing caps from the boilerconnections.2. Lift the boiler using the lower edges. Engagethe slot
8.0 Installation218.6 Fitting The FlueHORIZONTAL FLUE1. The standard flue is suitable for lengths100mm minimum to 1m maximum (measuredfrom the edge of
8.0 Installation228.6 Fitting the Flue (Cont)IMPORTANT: If the equivalent flue length isgreater than 1.5m the restrictor MUST beremoved from the adapt
8.0 Installation238.8 Making The Electrical ConnectionsTo connect the mains input cable proceed asfollows:-1. Slacken the facia securing screws and li
9.0 Commissioning the Boiler249.1 Commissioning the Boiler1. Reference should be made to BS 5449 whencommissioning the boiler. 2. Ensure that the fill
9.0 Commissioning the Boiler25OUTMINPressure Test Point Sealing ScrewFig. 339.2 Checking the Burner Pressure1. Turn on the gas and electrical supplies
10.0 Completion2610.1 Completion 1. Hinge the facia panel upwards and refit thecase front panel. Secure them with the screwspreviously removed (Fig. 3
11.0 Servicing the Boiler2711 .1 Annual Servicing1. For reasons of safety and economy, it isrecommended that the boiler is serviced annually.Servicing
11.0 Servicing the Boiler2811.1 Annual Servicing (Cont)11. Remove the spring clips retaining the air boxside baffle plates. Disengage the tabs on theb
12.0 Changing Components29IMPORTANT: When changing componentsensure that both the gas and electricalsupplies to the boiler are isolated before anywork
31.0 Introduction 42.0 General Layout 53.0 Appliance Operation 64.0 Technical Data 75.0 Dimensions and Fixings 116.0 System Details 127.0 Site Require
12.0 Changing Components3012.3 Heat Exchanger (Fig. 47)1. Note the positions of the two sensing tubes onthe outlet elbow and three wires on the fan mo
12.0 Changing Components3112.5 Injectors (Fig. 49)1. Remove the burner as described in Section12.4.2. Undo the screws securing the injectormanifold to
12.0 Changing Components3212.8 Gas Valve (Fig. 51)1. Undo the nut on the gas feed pipe under theboiler.2. Remove the securing screws and hinge thefaci
12.0 Changing Components3312.12 Pump - Head Only (Fig. 54)1. Drain the primary circuit and remove thesocket head screws securing the pump head tothe b
12.0 Changing Components3412.15 Pressure Gauge (Figs. 57 & 58)1. Drain the primary circuit and undo the nut onthe pressure gauge capillary.2. Remo
12.0 Changing Components3512.18 Main PCB (Fig. 62)1. Note the setting of the temperature controlknob. Rotate the knob fully anticlockwise andcarefully
12.0 Changing Components3612.20 Central Heating Differential Valve (Figs. 63 & 64)1. Drain the primary circuit.2. Undo the screw securing the micr
13.0 Illustrated Wiring Diagram37- brown- black- blue- redbrbkbr - green- green / yellow- whitegg/yw Return Heating Temperature SensorReset Selector S
3814.0 Fault FindingCarry out initial fault finding checks1. Check that gas, water and electrical supplies are available at the boiler. Electrical sup
3914.0 Fault FindingFault Finding Solutions Sections A to EIs there 230V at:Is there 230V at:Main terminals L and N Check electrical supply1.NOMain te
Potterton declare that no substances harmfulto health are contained in the appliance orused during appliance manufacture.1.1 Description1. The Pottert
4014.0 Fault FindingReplace PCBGCheck and correct if necessary1. Ignition electrode and lead2. Electrode connection3. Spark gap and position230V at PC
15.0 Short Parts List41Short Parts ListKey G.C. Description ManufacturersNo. No. Part No.22 E66 383 Fan 12e,18e, 24e 248001E66 527 Fan 28e 24800223 39
16.0 Notes42
16.0 Notes43
Potterton, Baxi UK Limited, Brownedge Road, Bamber Bridge, Preston, Lancashire. PR5 6SNAfter Sales Service 08706 096 096 Technical Enquiries 08706
2.0 General Layout52.1 Layout1. Air Pressure Switch2. Expansion Vessel3. Burner Manifold4. Automatic Air Vent5. Circulation Pump6. Drain Off Point7. P
3.0 Appliance Operation63.1 Operating Mode (Fig. 2)1. With a demand for heating, the pump circulateswater through the primary circuit. At a pre-determ
4.0 Technical Data74.1 System 12eFlue Terminal Diameter 100mmDimensions Projection 95mmOutercase DimensionsCasing Height - 780mmOverall Height Inc Flu
4.0 Technical Data84.2 System 18eFlue Terminal Diameter 100mmDimensions Projection 95mmOutercase DimensionsCasing Height - 780mmOverall Height Inc Flu
4.0 Technical Data94.3 System 24eFlue Terminal Diameter 100mmDimensions Projection 95mmOutercase DimensionsCasing Height - 780mmOverall Height Inc Flu
Komentáře k této Příručce